Accuracy on time, every time

Protective Screens

We now have a range of protective screens to help workplaces reopen safely.

We can also manufacture screens bespoke to any size required and have all fittings available for glazed screens – for any enquiries please email info@merlinarc.com or ring 0161 927 9292 and one of the team will be glad to assist.

All the items below are available on a 3-4 day lead time with the Desktop Safety Screens being on a 2-3 week lead time.

White/Silver 8mm Perspex Single Panel Screen with galvanized steel posts and caps 1200mm (W) x 1800mm (H)

White/Silver 8mm Perspex Double Panel Screen with galvanized steel posts and caps 1200mm (W) x 1800mm (H)

White/Silver 8mm Perspex Single Panel Screen with galvanized steel posts and caps 1800mm (W) x 1800mm (H)

White/Silver 8mm Perspex Double Panel Screen with galvanized steel posts and caps 1800mm (W) x 1800mm (H)

Desk Top Safety Screen Perspex 600mm (W) x 700mm (H). Cut out window 300mm (W) x 150mm (H)

Wire Hanging Safety Screen Perspex – Ceiling Fixing 700mm (W) x 665mm (H)

Sign Post Safety Shield Perspex 700mm (W) x 700mm (H) Square

Free Standing Perspex Screen (Windscreen) – Medium 980mm (W – including the returns) x 750mm (H) Front face 800mm (W). Cut out window 350mm (W) x 175mm (H)

Free Standing Perspex Screen (Windscreen) – Large 1430mm (W – including the returns) x 950mm (H) Front face 1200mm (W). Cut out window 350mm (W) x 175mm (H)

Wire Hanging Safety Perspex Screen – Ceiling & Desk Fixing 700mm (W) x 665mm (H)

Share:

Facebook
Twitter
Pinterest
LinkedIn
On Key

Related Posts

Certifire Certificates

Fire compliance and ensuring protection for all our clients and those using the building’s with our products is at the top of our priority list.

Sample Boards

Starting to process ideas and dreams for a project that’s a blank canvas is very exciting. However, to ensure your dreams really do become a

JTI, Crewe

THE CHALLENGE Virginia House, home to JTI in Crewe, underwent a modernisation programme lasting from 2023 and is set to finish completely in 2025. This